@Sheik or anyone else, I have a question I'm not quite sure how to deal with.
I'm redoing a bathroom. When I was scraping the popcorn ceiling, I must have screwed the sheetrock back and raised it up a little to the point it's not quite level. (I guess it was hanging down slightly before, not sure if by design or not)
I need to tile the shower up to the ceiling, but now this raised area won't reach. And a half-inch or whatever sliver of tile to fill in obviously isn't an option.
My idea was to put crown moulding up there to lower it an inch or whatever so a full piece will reach. Then I could slightly cut the edges of the other tiles to fit. Sound okay?
I guess I could try to somehow lower it again slightly, but I've already mudded over the screws and that would be a huge pain.
Any thoughts welcome. This is a weird problem I haven't seen addressed anywhere on the internet.